State of the art data acquisition and control system.
CTS Integration Lab and dedicated control/DAQ rack allows for training and test previewing independent of wind tunnel availability.
Software Engineering team is available to incorporate your unique test and data requirements.
Combining Calspan’s twin sting cart and high pressure air system, allow for a unique set of capabilities that are leveraged for successful stage separation testing.
High pressure air supply, F&M balances in both the launch vehicle and capsule, steady state and time varying pressure acquisition.